Usage¶
Scheduled Downtime: Shutdown of all HPC Clusters: 20.11.2026 – 04.12.2026
From 23 November 2026 until 4 December 2026 (expected), the computing center building (449.3) at KIT Campus North will be completely disconnected from the power grid due to mandatory inspections and maintenance work on the electrical infrastructure. This will affect all HPC systems operated at KIT. Jobs will only be running until noon on Friday, November 20, 2026. The following clusters will be unavailable during this period:
- bwUniCluster 3.0
- HoreKa 2
- HoreKa
- HAICORE@KIT
- Future Technologies Partition
During this period, access to your data will not be possible. Compute jobs will not run while the systems are offline. Workspace expiration and automatic deletion will be suspended for the duration of the downtime; therefore, no ws_extend request is required.
To avoid additional service interruptions in the near future, we will combine this building-related outage with our own maintenance activities, including operating system updates, software upgrades, file system maintenance, completion of the final phase of the power busbar upgrade, and preparations of the rack infrastructure for the planned GPU-based expansion of the HPC systems in 2027. Most importantly, this will include the final phase of bringing the Jade partition of HoreKa 2 into operation.
Once the maintenance work has been completed, the HPC systems will be brought back into operation one cluster at a time. The restart of all systems is planned to be completed by 4 December 2026.
Please be aware that, following the downtime and commissioning of the Jade partition, the second mandatory migration phase is active. This means that HoreKa (legacy) will only be accessible for logging in and accessing the file systems.
This section covers everything you need to know to work effectively on NHR@KIT systems — from logging in and transferring data to managing storage and submitting batch jobs.
- Login — How to connect to the login nodes via SSH.
- Data Transfers — Copying data to and from the cluster.
- Storage — Available file systems and storage locations.
- Software Modules — Loading and managing software with the module system.
- Batch System — Submitting and managing jobs with Slurm.